To the Top
The 3 steps are Choose table, Choose variable and Show result. You are currently at Choose variable

118r -- Building and dwelling production, 1995M01-2020M01

Choose variables

Yes
3/24/2020
Volume (m3):
m3
Floor area (m2):
m2
Dwellings (No.):
kpl
Building permits (No.):
kpl
4/28/2020
9/25/2018
Building and dwelling production, Statistics Finland
002_118r_2020m01
Now you have come to the page, Choose variable. This page give you the oportunity to select which variables and values you want to display in your result of the table. A variable is a property of a statistical unit. The page is divided into several boxes, one for each variable, where you can select values by click to highlight one or more values. It always starts with the statistics variable which is the main value counted in the table.
Mandatory

Selected 1 of total 4

Mandatory
Field for searching for a specific value in the list box. This is examples of values you can search for.1995M01 , 1995M02 , 1995M03 ,

Selected 1 of total 301

Mandatory
Field for searching for a specific value in the list box. This is examples of values you can search for.SSS All buildings , AA Residential buildings , 01 Detached houses ,

Selected 0 of total 21

Mandatory

Selected 0 of total 3

Number of selected data cells are:
(maximum number allowed is 300,000)

Presentation on screen is limited to 1,000 rows and 30 columns

Number of selected cells exceeds the maximum allowed 300,000
Revisions on these statistics
Description of statistic
Concepts and definitions
Changes in these statistics

Classification of Buildings 1994

The intended use of a building is determined according to the purpose for which the largest part of the gross floor area of the building is used. The classification of the intended use of buildings is given in Statistics Finland's Handbook Classification of Buildings 1994. Not all the classes in the building classification are included in the Statitics Finland's building stock.

Information

Building permits (No.)

A building permit is a licence to build which is issued in accordance with the Land Use Act and the Planning and Construction Act and is granted by the municipal building control or environmental control authority dependent on the size of the building project. A notification must be made of all building projects subject to a building permit, and statistics on building and dwelling production are compiled from the information in these notifications. Projects subject to a building permit comprise construction of a new building, construction of an annex, repairs and alterations comparable to the construction of a new building, extension of a building or increase of the space included in its floor area, and essential change of the purpose of use of a building or part of a building.